an abstract photo of a curved building with a blue sky in the background

Firm’s Name:

PHS ENGINEERING CORP.

Client’s Name:

Miami-Dade County Aviation Department

Project Description:

Engineering services for Miami International Airport Miami International Airport, Miami-Dade County, Florida

Projected Budget & Actual Cost:

$675,000 USD

Project Start Date & Project Completion Date:

August 2003 / August 2004

Project Work Plan:

CONCOURSE B AND CONCOURSE E IMROVEMENTS

Performed engineering services associated with concourses b and e, including building inspections, roof repair, and office improvements, covering an approximate area of 120,000 square feet. prepared engineering reports to formulate recommendations and project specifications and special provisions.

Contact Name & Telephone:

George Garcia 305-876-0618

Miami-Dade County Aviation Department

Projects - Engineering Services

Firm’s Name:

PHS ENGINEERING CORP.

Client’s Name:

Miami-Dade County Aviation Department

Project Description:

Engineering services for Miami International Airport Miami International Airport, Miami-Dade County, Florida

Projected Budget & Actual Cost:

$3.5 Million USD

Project Start Date & Project Completion Date:

November 2002 / October 2006

Project Work Plan:

SOUTH TERMINAL EXPANSION, INTERNATIONAL GATES, ENGINEERING SERVICES FOR CONCOURSES H & J MODIFICATIONS

Conduct threshold inspections for the entire program including south terminal expansion, concourse j, and improvements of concourse h. inspections are being completed to ensure that the contractor's structural work complies with the permitted construction documents. approximately 1.6 million square feet of development and expansion are being addressed under this airport expansion project.

Contact Name & Telephone:

George Garcia 305-876-0618

Miami-Dade County Aviation Department

Projects - Engineering Services

Firm’s Name:

PHS ENGINEERING CORP.

Client’s Name:

American Airlines, Miami International Airport - Teamed with Bnd Engineers, Inc.

Project Description:

Airside Civil Engineering Services - Miami International Airport, Miami, Florida

Projected Budget & Actual Cost:

$400.000 USD

Project Start Date & Project Completion Date:

December 1999 / March 2001

Project Work Plan:

NORTH TERMINAL AIRSIDE CIVIL ENIGNEERING SERVICES, CONCOURSES C-D APRON AND AIRIFIELD INFILL

Provide pavement design for both rigid and flexible pavements according to faa design guidelines and circulars and current miami-dade aviation department design guidelines. use of civil engineering for airfield pavement design including geometrix design in accordance with faa circulars. analysis of airplane mix and available geotechnical reports to achieve maximum pavement strength. use of “ledfaa” for pavement design in accordance with faa requirements. coordinated with other consultants to verify location of underground utilities for design of pavement slabs. prepared construction documents including pavement geometrix plans, existing pavement demolition plans, pavement details, pavement lighting, striping/marking plans, and aircraft parking plans. prepared technical specs and special provisions. construction engineering inspections of pcc slabs pouring of the approved heavy- and light-duty pavements and asphalt paving of the taxiway.

Contact Name & Telephone:

Basil Williams 305-499-8495

American Airlines, Miami International Airport

Projects - Engineering Services

Firm’s Name:

PHS ENGINEERING CORP.

Client’s Name:

Comprehensive Everglades Restoration Plan (Cerp) - Joint Venture between Phs, Parsons Engineering, Post Buckley Schuh & Jernigan for the U.S. Army Corps Of Engineers, Jacksonville District, Florida

Project Description:

Architectural And Engineering (A&E) Services - Providing A&E services for project management support for the Comprehensive Everglades Restoration Plan (CERP), a large-scale environmental initiative jointly led by the U.S. Army Corps of Engineers and the South Florida water management district for restoration of the everglades and the South Florida ecosystem.

Projected Budget & Actual Cost:

$2.7 million USD

Project Start Date & Project Completion Date:

March 2002 / February 2017

Project Work Plan:

PROGRAM MANAGEMENT

Analysis of existing conditions. including access roads, drainage, bridges, canals, spillways, basins, and reservoirs in everglades project area. providing recommendations based on lifecycle and utilization to establish future programming goals and implement schedules. developing data management system to track construction cost estimates, maintenance and operation cost. impact of ongoing projects and future planned projects is being researched.

Contact Name & Telephone:

Chuck Padera 904-232-1799

Comprehensive Everglades Restoration Plan (Cerp)

Projects - Engineering Services

Firm’s Name:

PHS ENGINEERING CORP.

Client’s Name:

Miami-Dade County Water And Sewer Department

Project Description:

General Engineering Consulting Services - Pump station, force main design, engineering support,

Projected Budget & Actual Cost:

$100.160 USD

Project Start Date & Project Completion Date:

December 1996 / October 1999

Project Work Plan:

MIAMI-DADE WATER AND SEWER DEPARTMENT GENERAL ENGINEERING CONSULTING SERVICES FOR COUNTYWIDE PUMP STATIONS/FORCE MAIN REHABILITATION

Use of hydraulic principles to design proposed force main, pump stations, and water distribution systems and to rehabilitate existing systems. use of reinforced concrete design principle for design/rehabilitation of pump wells (dry/wet). preparation of construction documents to support design and to obtain dry-run permitting. provide other engineering support related to the project description and as deemed necessary.

Contact Name & Telephone:

Steve Schoedinger, P.E. 305-827-6024

Miami-Dade County Water And Sewer Department

Projects - Engineering Services

Firm’s Name:

PHS ENGINEERING CORP.

Client’s Name:

Miami-Dade County Water And Sewer Department for peer consultants, inc.

Project Description:

General Engineering Consulting Services (Type B)

Projected Budget & Actual Cost:

$253.605 USD

Project Start Date & Project Completion Date:

June 2000 / July 2002

Project Work Plan:

INFILTRATION / EXFILTRATION / INFLOW (IEI) IMPROVEMENTS

Applied principles of hydraulics for infiltration / exfiltration / inflow analysis in existing miami-dade county water distribution systems and wastewater treatment facilities. analyzed field data and evaluated underground pipes, culverts and other water distribution systems. monitored microtunneling operations for new piping systems. prepared technical report documenting findings and recommendations.

Contact Name & Telephone:

Ivan Noel, pe, 305-819-1933

Miami-Dade County Water And Sewer Department

Projects - Engineering Services

Firm’s Name:

PHS ENGINEERING CORP.

Client’s Name:

Miami-Dade Transit Authority Teamed With HNTB

Project Description:

General Engineering Consultant Services

Projected Budget & Actual Cost:

$3 million USD

Project Start Date & Project Completion Date:

2004 / Ongoing

Project Work Plan:

EAST-WEST RAIL CORRIDOR

Services under this contract include evaluating previous studies performed on the East-West Corridor and adjacent areas. PHS is also reviewing previously proposed alignments and alternatives following consultation with the Federal Transit Administration (FTA). This will include an Alternatives Analysis and a new and/or supplemental with Draft and Final Environmental Impact Statements. As part of its role on the HNTB team, PHS will also make recommendations for a new draft and final environmental statements according to the federal and NEPA regulations. Preliminary Engineering assistance is being provided to Miami-Dade transit in obtaining the Record of Decision from the FTA. PHS is participating in preparing “New Starts” applications and a request to FTA to proceed with Final Design.

Contact Name & Telephone:

Jose de Almagro, P.E.- HNTB

Miami-Dade County Transit Authority

Projects - Engineering Services

Firm’s Name:

PHS ENGINEERING CORP.

Client’s Name:

Miami-Dade County Department Of Environmental Resources Management (Derm)

Project Description:

Federal Emergency Management Agency (Fema) Storm Drainage Projects - Application of civil engineering principles including hydraulics and environmental engineering to design new and upgrade existing stormwater systems and pavement drainage facilities for miami-dade county. this work is being conducted under remedial actions authorized by the federal emergency management agency as a result of damage from hurricane irene and the “no named storm.”

Projected Budget & Actual Cost:

$600.000 USD

Project Start Date & Project Completion Date:

March 2002 / December 2003

Project Work Plan:

MIAMI-DADE COUNTY DRAINAGE & ROADWAYS REHABILITATION PROGRAM

Performed drainage and roadway rehabilitation design for miami-dade county. scope of work included storm drainage design and roadway pavement resurfacing, construction services, meetings to discuss anticipated schedule problems and construction progress with contractor and owner; monitoring construction operations, periodic construction progress schedule review, response to rfi, and review of item requisitions.

Contact Name & Telephone:

Emile Amedee, P.E. 305-234-7424

Miami-Dade County Department Of Environmental Resources Management (Derm)

Projects - Engineering Services

Firm’s Name:

PHS ENGINEERING CORP.

Client’s Name:

Miami-Dade County Public Works Department

Project Description:

Construction Engineering Inspection (Cei) Services - Construction engineering inspections, provisions of field personel to assist public works department staff, shop drawing reviews, construction schedule review, construction meetings to discuss anticipated schedule and construction progress problems with contractor and owner, monitor construction operations and construction progress schedule review, response to rfis, review of requisition of pay items.

Projected Budget & Actual Cost:

$1.5 million USD

Project Start Date & Project Completion Date:

July 2002 / Ongoing

Project Work Plan:

MIAMI-CITY OF MIAMI AND MIAMI-DADE COUNTY ROADWAYS REHABILITATION PROGRAM

Monitoring construction operations at various locations. services include pavement resurfacing, sidewalk reconstruction, bridge deck and substructure maintenance.

MIAMI-CITY OF MIAMI AND MIAMI-DADE COUNTY DRAINAGE IMPROVEMENT PROGRAM

Placement of new drainage structures and new storm drainage systems for optimization of pavement runoff.

Contact Name & Telephone:

Octavio Marin, P.E. 305-375-1306

Miami-Dade County Public Works Department

Projects - Engineering Services

Firm’s Name:

PHS ENGINEERING CORP.

Client’s Name:

City Of North Miami Teamed with Parsons Engineering Sciences

Project Description:

Environmental Engineering Consultant Services - Environmental engineering services for design, rehabilitation, and maintenance of city of north miami’s facilities pump stations.

Projected Budget & Actual Cost:

$365,817 USD

Project Start Date & Project Completion Date:

January 1995-2000

Project Work Plan:

MIAMI-DADE COUNTY PUMP STATIONS/FORCE MAIN REHABILITATION- COUNTYWIDE PROGRAM

Used hydraulic and environmental engineering principles to design proposed force main, pump stations, and water distribution systems and to rehabilitate existing systems. utilized reinforced concrete design principles for design/rehabilitation of pump wells (dry/wet). prepared construction documents to support design and to obtain regulatory (dry-run) permitting. provided other engineering support related to the project as necessary.

Contact Name & Telephone:

Steve Schoedinger, P.E. 305-827-6024

City of North Miami

Projects - Engineering Services

Firm’s Name:

PHS ENGINEERING CORP.

Client’s Name:

City Of Miami, Department Of Capital Improvements

Project Description:

Engineering Services Wagner Creek and Lawrence Waterway

Projected Budget & Actual Cost:

$2 million USD (Wagner Creek); $2 million USD (Lawrence Waterway)

Project Start Date & Project Completion Date:

April 2003 / Ongoing

Project Work Plan:

CITY OF MIAMI

The scope of work is nearly identical on both projects including performing project management, field inspection of project site conditions; and, preparing construction documents for permitting and bidding for the city of miami. PHS is also obtaining and verifying as-built plans of existing utilities within project limits. Services include conducting dry-run permitting with all associated governing state and federal gencies and investigating current conditions for proposed dredging of associated canals. FDEP permitting is currently in progress and once the dredging permit is issued, PHS will begin monitoring the testing laboratory that will conduct the sampling and testing procedures for contaminated sediments. PHS will provide administrative support during the construction phase and is also assisting the city in identifying stockpile area locations for temporary storage of dredged materials.

Contact Name & Telephone:

Jose Lago III, PE 305-416-1252

City Of Miami, Department Of Capital Improvements

Projects - Engineering Services

Firm’s Name:

PHS ENGINEERING CORP.

Client’s Name:

Miami-Dade County Aviation Department

Project Description:

Miscellaneous Construction Inspection Services (CIS) Miami International Airport, Miami, Florida

Projected Budget & Actual Cost:

$394,674 USD (PHS Fees) / $4 million USD (Construction)

Project Start Date & Project Completion Date:

January 2000 / September 2002

Project Work Plan:

NORTHSIDE DRAINAGE AND UTILITIES, MIAMI INTERNATIONAL AIRPORT

Engineering construction inspections for runway resurfacing, installation of major drainage and underground utility systems, runway lighting, construction of electrical and communication ductbanks, runway striping, and pavement markings. conducted shop drawing review, construction schedule review, and weekly construction meetings to discuss anticipated schedule and construction progress with contractor and owner. also, monitoring of construction operations, periodic construction progress schedule review, response to RFI and review of requisition of pay items.

Contact Name & Telephone:

Steve Rusch, P.E. 305-876-0754

Miami-Dade County Aviation Department

Projects - Engineering Services

Firm’s Name:

PHS ENGINEERING CORP.

Client’s Name:

Miami-Dade County Aviation Department

Project Description:

Miscellaneous Construction Services - Engineering construction inspections, shop drawing reviews, construction schedule review, weekly construction meetings to discuss anticipated schedule and construction progress with contractor and owner, monitoring of construction operations, periodic construction progress schedule review, response to RFI, and review of requisition of pay items.

Projected Budget & Actual Cost:

$165,817 USD (Under Budget)

Project Start Date & Project Completion Date:

January 2000 / January 2001

Project Work Plan:

TAXIWAY IMPROVEMENTS PHASE II, KENDALL-TAMIAMI EXECUTIVE AIRPORT

Engineering construction inspections for runway resurfacing, installation of runway lighting, electrical and communication ductbanks, runway striping, and pavement markings

Contact Name & Telephone:

Frank Stirrup, P.E. 305-876-7922

Miami-Dade County Aviation Department

Projects - Engineering Services

Firm’s Name:

PHS ENGINEERING CORP.

Client’s Name:

Miami-Dade County Aviation Department

Project Description:

Miscellaneous Construction Inspection Services (CIS) - Engineering construction inspections, shop drawing reviews, construction schedule review, weekly construction meetings to discuss anticipated schedule and construction progress with contractor and owner, monitoring of construction operations, periodic construction progress schedule review, response to rfi, and review of requisition of pay items.

Projected Budget & Actual Cost:

$121.614 USD (PHS Fees) / $1.3 million USD (Construction)

Project Start Date & Project Completion Date:

January 2000 / July 2002

Project Work Plan:

NORTHSIDE DRAINAGE AND UTILITIES, MIAMI INTERNATIONAL AIRPORT

Engineering construction inspections for 36th street roadway and drainage improvements. roadway construction and pavement resurfacing, installation of storm drainage, pavement drainage pipes and catch basins, and pavement markings.

Contact Name & Telephone:

Steve Rusch, P.E. 305-876-0754

Miami-Dade County Aviation Department

Projects - Engineering Services

Firm’s Name:

PHS ENGINEERING CORP.

Client’s Name:

American Airlines, Miami International Airport - for Albaari & Associates, P.A.

Project Description:

Airside And Terminal Services Miami International Airport, Miami-Dade County, Florida

Projected Budget & Actual Cost:

$400.000 USD

Project Start Date & Project Completion Date:

November 1999 / March 2000

Project Work Plan:

CONCOURSE D - FACILITY MODIFICATIONS FOR TEMPORARY BAGGAGE HANDLING

Provided floor opening on second floor to install belt systems for temporary baggage handling from Airline baggage checking areas to tugs loading on the ground floor of the concourse in the airside area. provided MOT for temporary tug routes during baggage loading. used structural steel engineering principles to redistribute floor loading and reevaluate capacity of structural elements. retrofitted existing steel members as necessary. performed engineering analysis to verify structural adequacy and determined best constructable retrofitting scenario within project limitations and constraints. conducted field visits to verify as-built plans. coordinated with Architect to verify removal of existing walls and location of new walls. prepared construction documents and technical specifications and special provisions.

Contact Name & Telephone:

Raqueeb Albaari, AIA / Lino Fernandez 305-870-2685

American Airlines, Miami International Airport

Projects - Engineering Services

Firm’s Name:

PHS ENGINEERING CORP.

Client’s Name:

Miami-Dade County Aviation Department

Project Description:

Engineering Services for Miami International Airport Miami International Airport, Miami-Dade County, Florida

Projected Budget & Actual Cost:

$3.5 million USD (PHS FEES)

Project Start Date & Project Completion Date:

November 2002 / October 2006

Project Work Plan:

SOUTH TERMINAL EXPANSION, INTERNATIONAL GATES, ENGINEERING SERVICES FOR CONCOURSES H & J MODIFICATIONS

Conduct threshold inspections for the entire program including south terminal expansion, concourse j, and improvements of concourse h. inspections are being completed to ensure that the contractor's structural work complies with the permitted construction documents. approximately 1.6 million square feet of development and expansion are being addressed under this airport expansion project.

Contact Name & Telephone:

George Garcia 305-876-0618

Miami-Dade County Aviation Department