  • Comprehensive Everglades Restoration Plan – CERP

    Comprehensive Everglades Restoration Plan – CERP

    The scope of the work included, but was not limited to, developing and maintaining the master implementation sequencing plan; providing program control (scheduling) support...

    The scope of the work included, but was not limited to, developing and maintaining the master implementation sequencing plan; providing program control (scheduling) support; implementing the ACOE’s Corporate Management (P2); Assessing various programs and system-wide impacts; managing information and data financial management/budget and various reports (annual report to public, OMB and 5-year report to Congress); and responding to numerous data calls.

    PHS provided architectural and engineering services for program management support for the Comprehensive Everglades Restoration Plan (CERP), the world's largest environmental restoration initiative jointly lead by the U.S. Army Corps of Engineers (USACE).

    Projected Budget & Actual Cost: $2.7 Million (PHS Fees)
    Project Start Date & Project Completion Date: March 2002 / February 2007
    + Expand Article
  • South Florida Water Management District – Science and Engineering Support Services

    South Florida Water Management District – Science and Engineering Support Services

    Provided technical services for several disciplines including civil engineering, environmental engineering and technical writing.

    Provided technical services for several disciplines including civil engineering, environmental engineering and technical writing.

    Supported environmental monitoring and assessment functions in civil and environmental engineering; including water resources, pipeline design, regulatory and storm-water NPDES permitting, water supply, storm-water and hydraulic modeling and water treatment as part of hydraulic modeling efforts.

    Developed and calibrated the everglades landscape model (ELM) in order to further understand and predict recovery of eutrophic (nutrient-impacted) everglades regions.

    Provided technical writing/editing and project management of the 2004 everglades.

    Consolidated report and executive summary; documenting updating data and finding from everglades research monitoring and restoration activities to satisfy numerous regulatory reporting requirements.

    Projected Budget & Actual Cost: 1.5 Million (PHS Fees)
    Projected State Date & Project Completion Date: April 2003 / March 2006
    + Expand Article
  • Miami-Dade County Water And Sewer Department

    MIAMI-DADE COUNTY WATER AND SEWER DEPARTMENT

    Used hydraulic principles to design proposed force main pump stations and water distribution systems and to rehabilitate existing systems.

    Used hydraulic principles to design proposed force main pump stations and water distribution systems and to rehabilitate existing systems. Used reinforced concrete design principle for design/rehabilitation of pump wells (Dry/Wet). Prepared construction documents to support design and to obtain dry-run permitting. Provided other engineering support related to the project description and as deemed necessary.

    Projected Budget & Actual Cost: $100,106 (PHS Fees)
    Projected State Date & Project Completion Date: December 1996 / October 1999
    + Expand Article
  • Miami-Dade County Water And Sewer Department

    MIAMI-DADE COUNTY WATER AND SEWER DEPARTMENT

    Applied principles of hydraulics for infiltration / exfiltration / inflow analysis in existing Miami-Dade County Water Distribution Systems and wastewater treatment facilities.

    Applied principles of hydraulics for infiltration / exfiltration / inflow analysis in existing Miami-Dade County Water Distribution Systems and wastewater treatment facilities. Analyzed field data and evaluation of underground pipes, culverts and other water distribution systems. Monitored micro-tunneling operations for new piping systems. Prepared technical report to documenting findings and recommendations.

    Projected Budget & Actual Cost: $253,065 (PHS Fees)
    Projected State Date & Project Completion Date: June 2000 / July 2002
    + Expand Article
  • Miami-Dade Transit Authority - Teamed With HNTB

    MIAMI-DADE TRANSIT AUTHORITY - TEAMED WITH HNTB

    Services under this contract included evaluating previous studies performed on the East/West Corridor of adjacent areas. PHS also reviewed previously proposed alignments and alternatives following consultation with the Federal Transit Administration (FTA).

    East-West Corridor

    Services under this contract included evaluating previous studies performed on the East/West Corridor of adjacent areas. PHS also reviewed previously proposed alignments and alternatives following consultation with the Federal Transit Administration (FTA). This included an alternative analysis and a new or supplemental draft of its role on the HNTB team. PHS made recommendations for a new draft and the final recommendation statements according to the Federal and NEPA regulations. Preliminary engineering assistance was provided to Miami-Dade transit to obtain the Record of Decision from the FTA. PHS participated in preparing “New Starts” applications and request to FTA to proceed with the final decision.

    Projected Budget & Actual Cost: $3 Million (PHS Fees)
    Projected State Date & Project Completion Date:
    + Expand Article
  • Miami-Dade County Department Of Environmental - Resources Management (DERM)

    MIAMI-DADE COUNTY DEPARTMENT OF ENVIRONMENTAL - RESOURCES MANAGEMENT (DERM)

    Performed drainage and roadway rehabilitation design for Miami-Dade County. Scope of work included storm drainage design and roadway pavement resurfacing, construction services, meetings to discuss...

    Performed drainage and roadway rehabilitation design for Miami-Dade County. Scope of work included storm drainage design and roadway pavement resurfacing, construction services, meetings to discuss anticipated scheduling problems and construction progress with contractors and owners. Monitored construction operations, periodic construction progress schedule reviews. Responded to RFI’s and reviews of requisitions.

    Projected Budget & Actual Cost: $600K (PHS Fees)
    Projected State Date & Project Completion Date: March 2002 / December 2003
    + Expand Article
  • Miami-Dade County Public Works Department - Construction Engineering Inspection (CEI) Services

    MIAMI-DADE COUNTY PUBLIC WORKS DEPARTMENT - CONSTRUCTION ENGINEERING INSPECTION (CEI) SERVICES

    Monitored construction operations at various locations. Services included pavement resurfacing, sidewalk reconstruction, and bridge deck and substructure maintenance.

    Monitored construction operations at various locations. Services included pavement resurfacing, sidewalk reconstruction, and bridge deck and substructure maintenance. Placement of new drainage structures and new storm drainage systems for optimization of pavement runoff.

    Projected Budget & Actual Cost: $1.5 Million (PHS Fees)
    Projected State Date & Project Completion Date: July 2002 / September 2007
    + Expand Article
  • City Of Miami, Department Of Capital Improvements - Engineering Services Wagner Creek And Lawrence Waterway

    CITY OF MIAMI, DEPARTMENT OF CAPITAL IMPROVEMENTS - Engineering Services Wagner Creek and Lawrence Waterway

    The scope of work was nearly identical on both projects including performing project management, field inspection of project site condition and preparing construction document for permitting and bidding for the City of Miami.

    The scope of work was nearly identical on both projects including performing project management, field inspection of project site condition and preparing construction document for permitting and bidding for the City of Miami. PHS also obtained and verified as-built plans of existing utilities within project limits. Services included conducting dry-run permitting with all associates governing state and federal agencies and investing conditions for proposed dredging of associated canals. FDEP permits were authorized. PHS monitored testing laboratories that conducted sampling and testing procedures for contaminated sediments. PHS provided administrative support during construction phase and assisted the city in identifying stockpile area locations for temporary storage of dredged materials.

    Projected Budget & Actual Cost: $2 Million (Wagner Creek), $2 Million (Lawrence Waterway)
    Projected State Date & Project Completion Date: April 2003 / April 2006
    + Expand Article
  • Miami-Dade County Aviation Department – Engineering Services for Miami International Airport – Concourse B and Concourse E

    Miami-Dade County Aviation Department – Engineering Services for Miami International Airport – Concourse B and Concourse E

    Performed engineering services associated with Concourses’ B and E, including building inspection, roof repair, and office improvements covering an approximate area of 120,000 square feet.

    Performed engineering services associated with Concourses’ B and E, including building inspection, roof repair, and office improvements covering an approximate area of 120,000 square feet. Prepared engineering reports to formulate recommendations and project specifications and special provisions.

    Projected Budget & Actual Cost: $675K
    Projected State Date & Project Completion Date: August 2003 / August 2004
    + Expand Article
  • Miami-Dade County Aviation Department – Engineering Services for Miami International Airport – South Terminal Concourse H & J

    Miami-Dade County Aviation Department – Engineering Services for Miami International Airport – South Terminal Concourse H & J

    Conducted threshold inspection for the entire program including south terminal expansion of Concourse J and improvements of Concourse H. Inspections were completed to ensure...

    Conducted threshold inspection for the entire program including south terminal expansion of Concourse J and improvements of Concourse H. Inspections were completed to ensure contractors’ structural work complies with the permitted construction documents. Approximately 1.6 million square feet of development and expansion were addressed under this airport expansion project.

    Projected Budget & Actual Cost: $3.5 Million (PHS Fees)
    Projected State Date & Project Completion Date: November 2002 / October 2006
    + Expand Article
  • American Airlines – Miami International Airport – North Terminal – Concourses C & D

    American Airlines – Miami International Airport – North Terminal – Concourses C & D

    Provided pavement design for both rigid and flexible pavements according to the FAA design guidelines and circulars and current Miami-Dade Aviation Department.

    Provided pavement design for both rigid and flexible pavements according to the FAA design guidelines and circulars and current Miami-Dade Aviation Department.

    Used civil engineering for airfield pavement design including geometrix design in accordance with FAA circulars. Analyzed airplane mix and available geotechnical reports to achieve maximum pavement strengths. Used “LEDFAA” for pavement design in accordance with FAA requirements.

    Coordinated with other consultants to verify locations of underground utilities for design of pavement slabs. Prepared construction documents including pavement geometrix plans, existing pavement demolition plans, pavement details, pavement lighting striping/marking plan, and aircraft parking plans.

    Prepared technical specs and special provisions for construction engineering inspections of PCC slabs pouring of the approved heavy-and-light duty pavements and asphalts paving of the taxiway.

    Projected Budget & Actual Cost: $400K
    Projected State Date & Project Completion Date: December 1999/ March 2001
    + Expand Article
  • Miami-Dade County Aviation Department – Miscellaneous Construction Inspection Services (CIS) – Northside Drainage and Utilities – Miami International Airport

    Miami-Dade County Aviation Department – Miscellaneous Construction Inspection Services (CIS) – Northside Drainage and Utilities – Miami International Airport

    Conducted engineering construction inspections for runway resurfacing. Installed runway lighting, electrical and communication duct-banks, runway stripping and pavement markings.

    Conducted engineering construction inspections for runway resurfacing. Installed runway lighting, electrical and communication duct-banks, runway stripping and pavement markings. Conducted shop drawing reviews, construction schedule reviews, and weekly construction meetings to discuss anticipated schedule and construction progress with contractor and owner. Monitored construction operations, periodic construction progress scheduled reviews. Responded to RFI’s and reviewed requisitions of pay items.

    Projected Budget & Actual Cost: $394,674 (PHS Fees) – $4 Million (Construction)
    Projected State Date & Project Completion Date: January 2000 / September 2002
    + Expand Article
  • Miami-Dade County Aviation Department – Miscellaneous Construction Inspection Services (CIS – Taxiway Improvements Phase II, Kendall-Tamiami Executive Airport

    Miami-Dade County Aviation Department – Miscellaneous Construction Inspection Services (CIS – Taxiway Improvements Phase II, Kendall-Tamiami Executive Airport

    Conducted engineering construction inspections for runway resurfacing. Installation of runway lighting, electrical and communication duct-banks, runway stripping and pavement markings.

    Conducted engineering construction inspections for runway resurfacing. Installation of runway lighting, electrical and communication duct-banks, runway stripping and pavement markings.

    Projected Budget & Actual Cost: $165,817 (Under Budget)
    Projected State Date & Project Completion Date: January 2000 / January 2001
    + Expand Article
  • American Airlines – Miami International Airport – Air Side and Terminal Services

    American Airlines – Miami International Airport – Air Side and Terminal Services

    Provided floor opening on second floor to install belt systems for temporary baggage handling from airline baggage checking areas to tugs loading on the ground floor of...

    Provided floor opening on second floor to install belt systems for temporary baggage handling from airline baggage checking areas to tugs loading on the ground floor of the concourse in the Air side area.

    Provided MOT for temporary TUG routes during baggage loading. Used structural steel engineering principles to redistribute floor loading and re-evaluate capacity of structural elements. Retrofitted existing steel members as necessary.

    Performed engineering analysis to verify structural adequacy and determined best constructible retrofitting scenario within project limitations and constraints. Conducted field visits to verify as-built plans.

    Coordinated with architects to verify removal of existing walls and location of new walls. Prepared construction documents and technical specification and special provisions.

    Projected Budget & Actual Cost: $400,000
    Projected State Date & Project Completion Date: November 1999 / March 2000
    + Expand Article